The Modular Process
A turn-key modular building project involves key steps from initial programming through project turnover. Here's a comprehensive outline, but don’t worry. Our project team is here to walk you through every step.
1. Project Initiation and Programming:
• Define project goals, requirements, and objectives.
• Conduct a needs assessment to understand client specifications.
• Collaborate with stakeholders to gather essential information for design.
2. Conceptual Design:
• Develop preliminary design concepts based on project requirements.
• Refine the design based on client input and finalize conceptual plans.
• Establish a preliminary budget and timeline.
3. Bid Phase:
• Conduct a site visit to assess the project site, understand local conditions, and gather additional information that could impact pricing.
• Universal Modular will seek bids from all required subcontractors.
• Universal Modular will prepare and submit a formal proposal with details, specifications, and estimated schedule.
• Customer will award the project and issue a purchase order.
4. Detailed Design and Engineering:
• Create detailed architectural plans and engineering drawings.
• Obtain necessary permits and approvals from regulatory authorities.
• Develop a comprehensive schedule.
5. Fabrication of Modular Components:
• Order all required long lead materials.
• Fabricate modular components off-site in a controlled environment.
• Conduct quality control checks during the manufacturing process.
6. Site Preparation:
• Clear and prepare the construction site.
• Install foundation systems compatible with modular construction.
• Install all required utilities (electrical, data, water, sewer).
7. Module Delivery and Assembly:
• Transport modular components to the customer site.
• Assemble modules according to the engineered plans.
• Ensure precise alignment and integration of modules.
8. Mechanical, Electrical, and Plumbing (MEP) Installation:
• Connect modular components for seamless MEP system integration.
• Install plumbing, electrical, and HVAC systems.
• Conduct thorough inspections to ensure code compliance.
9. Interior Finishing:
• Complete interior finishes, including flooring, walls, and ceilings.
• Install fixtures, furnishings, and any specialized equipment and cabling.
• Ensure compliance with design specifications and quality standards.
10. Exterior Finishing:
• Apply exterior finishes to achieve the desired aesthetic.
• Install windows, doors, decks, ramps, and any additional exterior elements.
11. Project Commissioning:
• Commission the entire building to ensure all systems operate as intended.
• Obtain necessary approvals and documentation.
• Address any customer punch items.
12. Project Turnover:
• Conduct a final walkthrough with the client.
• Deliver all relevant documentation, including operation and maintenance manuals.
• Schedule your move in!
By following these steps, we will successfully execute your project, delivering a high-quality, fully functional facility.